Keep your distance from the animals and don't feed or pet them - you may be fined.

Policies Map

Summary

AI generated summary
Map showing the adopted Hampshire Minerals & Waste Plan policies (October 2013) and where key mineral and waste locations are across Hampshire, including Portsmouth, Southampton, the New Forest National Park, and the South Downs National Park. It identifies safeguarding areas for mineral resources such as clay, sharp sand and gravel, silica sand, and soft sand, and highlights potential mineral and waste wharves. The map also marks safeguarded operational sites, including sand and gravel quarries, chalk pits, oil and gas sites, aggregate recycling sites, concrete and asphalt plants, rail depots, wharves, household waste recycling centres, material recovery facilities, composting sites, waste transfer stations, metal recycling sites, energy recovery facilities, landfills, and liquid waste treatment facilities. It also shows proposed sites and inset map areas, plus major roads and railways.

Document Viewer

Safeguarding areas (Policies 15 & 34)

  • Potential mineral & waste wharves (Policy 34)
  • Mineral Safeguarding Area (Policy 15)
    • Clay
    • Sharp Sand and Gravel
    • Silica sand
    • Soft Sand

Safeguarded sites (Policies 16 & 26)

  • Sand and gravel quarries
  • Chalk pits
  • Oil and gas
  • Aggregate Recycling sites
  • Concrete Batching / Asphalt plants
  • Rail depots
  • Wharves
  • Household Waste Recycling Centres (HWRC)
  • Material Recovery Facilities (MRF)
  • Composting sites
  • Waste Transfer Stations (WTS)
  • Metal recycling sites (MRS & ELV)
  • Energy Recovery Facilities (ERF)
  • Landfills
  • Liquid waste treatment (including WWTW)

Hampshire Minerals & Waste Plan

Policies Map - October 2013 (Adopted)

Proposals

  • Inset Maps
  • Proposed sites (Policies 19, 20, 21, & 32)
  • Whitehill & Bordon safeguarding (Policy 15)

Based upon the BGS mineral resources data, with permission of the British Geological Survey.

© Crown Copyright and database rights 2013. All rights reserved. HCC 100019180

Plan area

  • Portsmouth City
  • Southampton City
  • New Forest National Park
  • South Downs National Park
  • Strategic roads
  • Railway

0 9 18 km

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9
  10. 10
  11. 11
  12. 12
  13. 13
  • 410000
  • 410000
  • 420000
  • 420000
  • 430000
  • 430000
  • 440000
  • 440000
  • 450000
  • 450000
  • 460000
  • 460000
  • 470000
  • 470000
  • 480000
  • 480000
  • 90000
  • 90000
  • 100000
  • 100000
  • 110000
  • 110000
  • 120000
  • 120000
  • 130000
  • 130000
  • 140000
  • 140000
  • 150000
  • 150000
  • 160000
  • 160000
  • 170000
  • 170000

Ü