Animal accidents on New Forest roads can have devastating consequences for livestock and drivers alike - please stay alert and slow down

SD/042 New Forest National Park Local Plan – Nutrient Budget Appendix 1

Summary

AI generated summary
Nutrient Budget GBLP 2038 (last modified July 2026) sets out expected total nitrogen (TN) loads from planned housing in two nutrient catchments, split into 0–5 years and 5+ years. For allocation sites, New Forest Rivers includes 80 dwellings with 160.72 TN (131.5 TN from 50 dwellings in 0–5 years; 29.2 TN from 30 dwellings in 5+ years). Test and Itchen includes 241 dwellings with 386.41 TN (17.0 TN from 30 dwellings in 0–5 years; 369.4 TN from 211 dwellings in 5+ years). Total allocation demand is 321 dwellings and about 547 TN (149 TN in 0–5 years; 399 TN in 5+ years). Windfall sites add 200 dwellings and about 692 TN, with 301 TN in 0–5 years and 391 TN in 5+ years.

Document Viewer

Appendix 1 - Nutrient Budget GBLP 2038

Last modified: July 2026

Allocation Sites NFNPA Local Plan (New Forest Rivers)

Site Information Units 0-5 years 5+ Years
Site Ref. Site Name Nutrient Catchment Capacity No. Built (all years) TOTAL (TN) (all years) TOTAL DWELLINGS (all years) SUB-TOTAL (0-5 years) - Total Nitrogen SUB-TOTAL (0-5 years) - Dwellings SUB-TOTAL (5+ years) - Total Nitrogen SUB-TOTAL (5+ years) - Dwellings
Land at Calpe Avenue, Lyndhurst New Forest Rivers 50 0 131.50 50 131.5 50 0.0 0
Land to west of Brighton Road, Sway New Forest Rivers 30 0 29.22 30 0.0 0 29.2 30
80 0 160.72 80 131.5 50 29.2 30

Allocation Sites NFNPA Local Plan (Test and Itchen)

Site Information Units 0-5 years 5+ Years
Land Availability Site Ref Site Ref Site Name Sub - Catchment Nutrient Catchment Capacity No. Built (all years) TOTAL (TN) (all years) DWELLINGS (all years) SUB-TOTAL (0-5 years) - Total Nitrogen SUB-TOTAL (0-5 years) - Dwellings SUB-TOTAL (5+ years) - Total Nitrogen SUB-TOTAL (5+ years) - Dwellings
Land to south of Hamptworth Rd, Landford Test and Itchen 30 0 0.00 30 0.0 0 0.0 30
SP23 Land at Ashurst Hospital Bartley Water Test and Itchen 30 0 17.04 30 17.0 30 0.0 0
Land at Knellers Lane, Ashurst Bartley Water Test and Itchen 70 0 109.40 70 0.0 0 109.4 70
Land to west of Winsor Road, Winsor Bartley Water Test and Itchen 55 0 77.80 55 0.0 0 77.8 55
Land to east of The Ridge, Redlynch Test and Itchen 50 0 131.58 50 0.0 0 131.6 50
Land at Ringwood Road, Netley Marsh Test and Itchen 6 0 50.59 6 0.0 0 50.6 6
241 0 386 241 17 30 369 211

Total Demand (Allocations)

Site Information Units 0-5 years 5+ Years
Nutrient Catchment Nutrient Credits Capacity No. Built (all years) TOTAL (TN) (all years) DWELLINGS (all years) SUB-TOTAL (0-5 years) - Total Nitrogen SUB-TOTAL (0-5 years) - Dwellings SUB-TOTAL (5+ years) - Total Nitrogen SUB-TOTAL (5+ years) - Dwellings
New Forest Rivers Total Nitrogen 80 0 160.72 80 131.5 50.0 29.2 30.0
Test and Itchen Total Nitrogen 241 0 386.41 241 17.0 30.0 369.4 211.0
321 0 547 321 149 80 399 241

Windfall sites

Site Information Units 0-5 years 5+ Years
Site Ref. Name Sub Catchment Nutrient Catchment Capacity No. Built (all years) TOTAL (TN) (all years) DWELLINGS (all years) SUB-TOTAL (0-5 years) - Total Nitrogen SUB-TOTAL (0-5 years) - Dwellings SUB-TOTAL (5+ years) - Total Nitrogen SUB-TOTAL (5+ years) - Dwellings
Catchment-wide windfall New Forest Rivers 72 0 245.39 72 81.8 24 163.6 48
Catchment-wide windfall Test and Itchen 108 0 340.82 108 113.6 36 227.2 72
Windfall Allocation Land east of New Inn Road, Bartley Bartley Water Test and Itchen 10 0 13.63 10 13.6 10 0.0 0
Windfall Allocation Tatchbury Manor 10 0 92.02 10 92.0 10 0.0 0
200 0 692 200 301 80 391 120

Page 1 of 1