AM 753/26 – Annex 3 – Draft Regulation 22 Consultation Statement, Part 3 Regulation 19

Summary

AI generated summary
Sets out how the New Forest National Park Authority carried out the Regulation 19 consultation (17 August to 30 September 2026) for the Local Plan Review 2024–2043 and meets Regulation 22 requirements. It describes who was consulted, how the consultation was promoted, where documents were available, and how to respond. Engagement included notifying 211 consultees, reaching 27,000 e-news subscribers, an online session, and six drop-in events. Over 300 respondents submitted about 749 comments, with most feedback on the spatial strategy and site allocations. Key issues included unmet housing need, settlement hierarchy choices, objections to specific housing and travelling showpeople sites (transport, landscape, habitats, flooding, and services), reliance on one main employment allocation, calls for more renewable energy ambition, and support for principal residency and local connection policies. It records agency responses and lists proposed policy modifications.

Document Viewer

AM 753/26 - Annex 3

Draft Regulation 22 Consultation Statement

Part 3 Regulation 19

New Forest National Park
Local Plan Review 2024 - 2043

December 2026

1. Introduction

Purpose of this Statement

1.1. This Statement of Consultation has been prepared to comply with Regulation 22 (1)(c) of the Town and Country Planning (Local Planning) (England) Regulations 2012, which states:

Submission of documents and information to the Secretary of State
22.(1) The documents prescribed for the purposes of section 20(3) of the Act are—

(a) the sustainability appraisal report;

(b) a submission policies map if the adoption of the local plan would result in changes to the adopted policies map;

(c) a statement setting out—

  1. (i) which bodies and persons the local planning authority invited to make representations under regulation 18,
  2. (ii) how those bodies and persons were invited to make representations under regulation 18,
  3. (iii) a summary of the main issues raised by the representations made pursuant to regulation 18,
  4. (iv) how any representations made pursuant to regulation 18 have been taken into account;
  5. (v) if representations were made pursuant to regulation 20, the number of representations made and a summary of the main issues raised in those representations; and
  6. (vi) if no representations were made in regulation 20, that no such representations were made;

(d) copies of any representations made in accordance with regulation 20; and

(e) such supporting documents as in the opinion of the local planning authority are relevant to the preparation of the local plan.

1.2. It sets out how the Authority has undertaken community participation and stakeholder involvement in the production of the New Forest National Park Local Plan Review in accordance with the Town & Country Planning (Local Planning) (England) Regulations 2012, the Statement of Community Involvement (SCI) and Local Development Scheme (LDS) in place at the time.

1.3 This statement should be read in conjunction with the Local Plan Reg 18 (Part 1) Consultation Statement (November 2025), which summarises consultation undertaken during February – March 2025 on the Strategic Direction of Travel document. Further consultation was undertaken on a full draft local plan during November – December 2025 as set out in the Local Plan Reg 18 (Part 2) Consultation Statement (August 2026).

1.4 This statement therefore reflects consultation under Regulation 19, on the pre-submission draft Local Plan Review for six weeks, between 17 August and 30 September 2026. Accordingly, this statement summarises the consultation process, comments received and how the Authority has responded to the main issues raised, prior to submission of the Local Plan Review for examination.

Background

1.5 The New Forest National Park Authority undertook a review of the planning policies set out in the New Forest National Park Local Plan 2016–2036, adopted in August 2019, to determine whether they needed updating. This assessment was due by August 2024 (5 years from the date of adoption) and was in response to changes in national policy and the experiences of applying the adopted planning policies for the past five years. However, it is important to emphasise that many key aspects of national planning policy, guidance and law relating to National Parks remain unaltered from the time the Local Plan was prepared, examined and adopted. Therefore, the Authority has undertaken a review of the Local Plan rather than preparing a completely new Local Plan. At the Authority Meeting on 21 March 2024 (report AM 675/24), members to a review of the adopted Local Plan.

1.6 The revised Local Plan will form a key part of the statutory ‘development plan’ for the National Park and to guide decisions on planning applications submitted. The Local Plan sets out detailed planning policies and allocations that seek to deliver the two statutory National Park purposes and related socio-economic duty, together with the Protected Landscape Duty, which requires that relevant authorities ‘seek to further’ the statutory purposes.

Duty to Cooperate

1.7 The “Duty to Cooperate” was introduced by Section 33A of the Planning and Compulsory Purchase Act (2004). Section 110 of the Localism Act (2011) reinforces the duty to cooperate as per Section 33A, in relation to the planning of sustainable development. It places a legal duty on Local Planning Authorities, County Councils and prescribed public bodies to engage constructively, actively, and on an ongoing basis to maximise the effectiveness of a local plan in the context of strategic cross boundary matters.

1.8 On 25 March 2026, through the Levelling-up and Regeneration Act 2023, the formal duty was abolished, however, there remains a requirement for Local Planning Authorities to cooperate and engage on cross boundary issues.

1.9 Engagement has taken place to date with both neighbouring local authorities and the prescribed bodies. Further details are set out in the Cooperation Statement and agreed Statements of Common Ground published separately to this report on the examination webpage.

2. Overview New Forest National Park Local Plan Review Timeline

2.1 The Local Plan Review has been developed through several consultation stages supported by early and ongoing engagement with communities, businesses and organisations, ensuring the final strategy and policies reflect the needs of the New Forest National Park.

2.2 The table below summarises the key plan preparation and consultation stages undertaken in the development of the Local Plan Review prior to its submission in December 2026.

Key stages of the Local Plan preparation prior to submission for examination Key dates Summary
Resolution made to undertake a Local Plan Review March 2024 The decision to undertake a partial review of the Local Plan was made during the Authority Meeting on 21 March 2024.
Review of the Local Plan adopted 2019, commissioning of new evidence studies, and preparation of a draft Local Plan

Authority meeting 25 July 2024 agreed to update LDS (report AM 684/24)
March 2024 to January 2025 Review of existing policies and evidence; commissioning of updated evidence and further research to inform the Local Plan Review.
Regulation 18 Part 1 Strategic Direction of Travel Consultation & Call for Sites

Authority meeting 23 January 2025 agreed to consultation on the Direction of Travel Document (report AM 702/25)
February to March 2025 Public consultation on the key issues and options took place over a 6-week period in early 2025. Four drop-in events were held, and a questionnaire was produced and made available to statutory consultees, stakeholders and residents.

A ‘Call for Sites’ was also undertaken, inviting local communities, landowners and developers to put forward sites for consideration for residential; employment; and Gypsy, Traveller & Travelling Showpeople development, among other uses.
Consideration of Reg.18 (Part 1) representations & technical evidence, with amendments to the draft Local Plan April to October 2025 Representations to the Part 1 consultation were reviewed, alongside evidence from technical studies & Duty to Cooperate meetings. A draft Local Plan was prepared. Further technical studies were commissioned.
Stage Key dates Summary
Regulation 18 Part 2 Draft Local Plan Consultation

Authority meeting 16 October 2025 agreed to consultation on the draft Local Plan (report AM 727/25)
November to December 2025 Public consultation on the draft local plan took place, evidence studies and supporting documents were also published. An online consultation platform was used to receive representations.

The consultation ran for 6 weeks in late 2025 and included 5 drop-in events and an online presentation with a Q&A session.
Consideration of Reg.18 (Part 2) representations & amendments to draft Local Plan January to July 2026 Comments from the second consultation were reviewed, alongside evidence from Duty to Cooperate meetings and completed evidence studies.

The draft Local Plan was accordingly amended to reflect representations where justified.
Regulation 19 Pre-Submission Consultation

Authority meeting 23 July 2026 agreed to LDS update and consultation on the Regulation 19 draft Local Plan (report AM 740/26)
August to September 2026 Consultation was undertaken on the revised local plan and its evidence base over the course of 6 weeks.

This included 6 drop-in events and an online presentation with a Q&A session. An online consultation platform was used to publish the consultation documents and to receive representations.
Preparation of submission to Secretary of State

Authority meeting 27 November 2026 agreed to submit the Local Plan Review for examination
October to November 2026 The NPA reviewed the comments received during the Regulation 19 consultation. It is the National Park Authority’s view that the draft Local Plan meets the legal requirements, is sound, and is ready to be submitted for Independent Examination, which was agreed at the Authority meeting on 27 November 2026.
Submission to Secretary of State for examination (Reg.22) December 2026 The final draft of the Local Plan and supporting documentation including a schedule of proposed modifications for consideration through the examination was submitted to the Secretary of State in December 2026.

3. Part 3 Regulation 19

3.1 Prior to commencement of the consultation, presentations providing an update on the Local Plan were delivered to NPA members (on 24 February, 15 April, 11 June 2026). These sessions set out the responses to the previous Regulation 18 Part 2 consultation and provided detail on where and how the Local Plan had evolved in light of feedback. Through these sessions members could recognise the concerns of the community and continue to incorporate local issues into developing planning policy.

3.2 Updates were also provided at Parish Quadrant meetings, the New Forest Consultative Panel, and New Forest Access Forum meetings in the first half of 2026.

3.3 Approval was given during the Authority meeting on 23 July 2026 for publication of the Regulation 19 Submission draft Local Plan review for consultation.

3.4 The Regulation 19 consultation on the Proposed Submission Local Plan Review was undertaken for 6 weeks between 17 August - 30 September 2026.

3.5 The Regulation 19 representation period is the last stage of public engagement before submitting the draft plan to the Planning Inspectorate for examination. This is a formal process that requires comments on the soundness and legal compliance of the plan.

Summary of Engagement

3.6 Publication of the Proposed Submission local Plan Review was sent to all those specific and general consultation bodies (211 recipients) as prescribed by planning regulations (Appendix A), in addition to those registered within the National Park Authority to receive its Enews which has 27,000 subscribers. Details were supplied of when and where documentation would be publicly available to view, and how representations could be submitted.

3.7 Consultation was promoted through a number of channels including press releases; media coverage; e-newletters, social media and posters were displayed across the National Park as set out in Appendix B. A formal public notice was also published in the Lymington Times and New Milton Advertiser for one week – see Appendix C.

3.8 A Statement of Representations Procedure was duly published setting out the subject matter and area covered; the consultation period; where to view documents and how to make a representation. The Authority’s data protection policy and privacy notice were also highlighted in terms of how the representations submitted would be processed and subsequently published.

3.9 The draft Local Plan and key supporting information were available for inspection at the Authority’s office during normal office hours in Lymington Town Hall, Avenue Road, Lymington, SO41 9ZG; and online at: Local Plan review 2025-27 - New Forest National Park.

3.10 An online presentation was held via Microsoft Teams on Thursday 10 September 2026, between 4pm – 5.30pm.

3.11 The presentation was also delivered during several in-person public drop-in events (2pm – 7pm) that were held across the National Park to enable people to speak to planning staff and find out more about the Local Plan review.

3.12 All drop-in sessions were structured as follows:

  • 2pm-5pm - view the display boards and chat informally with National Park Authority officers about the revised draft Local Plan.
  • 5.30pm - presentation explaining the key changes since the 2025 consultation and the next steps for the Local Plan, followed by a managed Q&A session.
Location Date Approximate number of attendeees
Landford Village HallWednesday 2 September 202645
Bartley Village HallFriday 4 September 202629
The Copythorne & District Royal British Regional HallMonday 7 September 202639
Jubilee Field, SwayTuesday 8 September 202636
Lyndhurst Community CentreFriday 11 September 202616
Redlynch Village HallWednesday 16 September 202635

3.13 Representations could be submitted via:

  • the online consultation portal, or
  • email to policy@newforestnpa.gov.uk, or
  • posted to the Policy Team, New Forest National Park Authority, Lymington Town Hall, Avenue Road, Lymington, SO41 9ZG.

Consultation Responses – Overview

3.14 When submitting representations, respondents were asked whether they believed the draft Local Plan Review, in whole or in part, to be sound and legally compliant. Respondents were also given the opportunity to provide comments and to propose modifications. The majority of comments were submitted through the Authority’s online consultation portal Commonplace, with some responses also being sent by email and letter, these have since been uploaded to Commonplace to enable the following analysis.

3.15 All responses can be viewed in full at New Forest National Park Authority Local Plan Examination - New Forest National Park

3.16 Representations were received from over 300 different organisations, groups and individuals, of these responses some 749 comments were made. Figure 1 below summarises the breakdown of representations per chapter:

Figure 1: Total representations received broken down by chapter.

Figures 2 and 3 below summarise1 legal compliance and soundness:

Figure 2 Overview of Legal Compliance per chapter.

1 Not all representations responded to these questions

Figure 3 Overview of Soundness per chapter.

3.17 As the data above illustrates, Chapter 4 and 8 generated the most feedback, commenting on the spatial strategy and associated site allocations.

4. Summaries of Representations and Key Issues

4.1 Assessment of the representations reveals the following key issues raised through the Regulation 19 consultation:

Key Issues Raised

  • Concerns raised regarding the draft Local Plan’s approach of not meeting the identified housing needs arising within the National Park in full and the potential impact on the socio-economic well-being of communities within the National Park.
  • Representations on whether the proposed spatial strategy (draft policy SP3) is the most appropriate. This includes representations objecting to the proposed settlement hierarchy and the identification of the smaller defined villages; as well as representations promoting sites on the edge of the National Park (adjacent to larger settlements outside the National Park) in meeting identified development needs.
  • Local community opposition to the proposed site allocations (for housing and travelling showpeople use) citing impacts on road infrastructure and the lack of public transport opportunities; impacts on landscape character and protected habitats; lack of infrastructure (primarily health and education); loss of local distinctiveness; and the risk from increased flood risk.
  • The relevant landowners confirm that the proposed site allocations are available and deliverable within the Local Plan period.
  • Concerns that the majority of the identified employment needs are proposed to be met in a single allocation, rather than being distributed on sites across the area.
  • Representations seeking greater encouragement for the provision of larger renewable energy schemes, rather than focus on small-scale proposals
  • Expressions of support for the proposed ‘principal residency condition’ for new open market housing; and the local connection criteria for new affordable housing to ensure development meets needs arising within the National Park.
  • Representations from some landowners and developers regarding the proposed retention of the existing floorspace limit for net new dwellings (draft policy SP31), the proposed introduction of the ‘principal residency condition’ and the proposed affordable housing targets (draft policy SP42).

Sustainability Appraisal & Habitats Regulation Assessment

4.2 Throughout the plan making process the Authority has engaged with the environmental agencies (Natural England, Historic England and Environment Agency), particularly in respect of their roles with the Sustainability Appraisal and Habitat Regulations Assessment. The following table summarises their representations on the Regulation 19 Local Plan:

Organisation Response to Reg 19 NFNPA response
Natural England

Natural England welcomes the strong engagement with the New Forest National Park Authority and the positive consideration given to their feedback to the Draft Local Plan. Natural England considers the Local Plan to be sound.

Site Allocations for C2 use – suggest that mitigation requirements are clarified for consistency.

Alternative Greenspace and references to Strategic Access Management and Monitoring to be referred to in the local plan or in a Statement of Common Ground.

Habitat Regulations Assessment – satisfied that given the quantum of housing proposed the mitigation measures remove adverse effects on integrity of the designated sites.

Comments welcome and support noted.

Proposed Modification PSM17 addresses the point made in terms of C2 uses and urban edge impacts.

Statements of Common Ground have been prepared with key partners and refer to this matter where relevant.

Noted and welcomed.

Historic England Welcome the inclusion of policies for the historic environment which meet the obligation for preparing a positive strategy as required by the NPPF. The key test of the soundness of the plan and the achievement of sustainable development as defined in the NPPF in respect of the elements that relate to the historic environment (paragraph 196) have been met. Noted and welcomed.
Environment Agency

No comments to make regarding soundness or legal compliance as the Plan is comprehensive in nature and covers matters within our remit to a satisfactory standard.

Number of minor comments made in support of amendments to policies in response to Reg 18 comments.

Request that the evidence base should include the results of the Sequential Test, to accord with national policy.

Noted and welcomed.

Noted

A Sequential Test has been completed and published as part of the evidence base for the local plan.

4.3 The following table summarises those representations which made specific reference to the Sustainability Appraisal/Strategic Environmental Assessment, with a focus on the spatial strategy options tested as reasonable alternatives:

Respondent Main Issues Raised How the representations have been taken into account
Luken Beck (obo Seaward Properties)

The SA considers a number of reasonable alternatives for accommodating growth within the National Park, including Option E, which would involve the allocation of land around the periphery of the National Park on sites related to settlements outside the Park boundary. Seaward Properties does not suggest that all land adjoining settlements outside the National Park should be regarded as suitable for development. However, concern is raised that the appraisal of Option E adopts a high level and broad-brush assessment which does not sufficiently distinguish between different types of peripheral site.

The SA does not fully consider the distinction between dispersed peripheral growth across a wide range of locations; and carefully selected sites adjoining the most sustainable settlements outside the National Park boundary.

This representation on behalf of Seaward Properties raises very similar points to the representations made on behalf of Pennyfarthing Homes, Taylor Wimpey and Gervis Property.

The Authority’s view is that the SA/SEA of the draft Local Plan is required to consider ‘reasonable alternatives’ and the representation recognises that that has been done (which is welcomed). Our view is that the SA assessment is not required to assess every possible permutation and option, and the SA of the Regulation 19 Local Plan already considered a meaningful range of realistic options (given the focus of national planning policy on small-scale development to meet the needs arising from local communities within the National Park).

Respondent Main Issues Raised How the representations have been taken into account

The appraisal itself identifies significant strengths associated with Option E, including its performance in relation to housing delivery, community outcomes and economic objectives. Given the scale of unmet need that remains under the preferred strategy, it is considered that the Sustainability Appraisal should give greater consideration to whether a more targeted form of Option E, focused on carefully selected sites adjoining sustainable settlements such as Lymington and Pennington, could contribute towards meeting housing needs without undermining the statutory purposes of the National Park.

Similarly, the Authority should consider whether a blended approach drawing upon elements of both Option B and Option E would provide a more balanced strategy.

It is acknowledged that a refined peripheral growth strategy would not necessarily achieve the full level of housing delivery associated with Option E as assessed through the Sustainability Appraisal. However, a targeted approach focused on a limited number of well-contained sites adjoining the most sustainable settlements outside the National Park boundary could make a meaningful contribution towards identified housing needs.

For these reasons, we consider that further review of the Sustainability Appraisal and the reasonable alternatives underpinning the spatial strategy is warranted before the Plan can be regarded fully justified.

The SA/SEA of the Regulation 19 Submission draft Local Plan considered a range of ‘reasonable alternatives’ to meet identified housing needs within the context of a nationally-protected landscape. This included a ‘blending’ of several options and the fact that 8 different scenarios were assessed is considered reasonable.

At this stage the Authority does not believe there is a need for additional SA/SEA work on reasonable alternatives, as options HO1 – HO8 in the Regulation 19 Local Plan SA/SEA meet the needs of the regulations and are pitched at the appropriate level for the Local Plan-making process.

Boyer Planning (obo Taylor Wimpey)

It is considered that Growth Option HO5 provides the most suitable growth strategy for NFNPA to deliver the necessary housing and employment in the next plan period whilst having regard to the relevant Sustainability Appraisal themes. Option HO5 adds to Option HO2, incorporating housing adjacent to settlements around the periphery of the National Park which would include Ringwood.

It is considered that with suitable policies to address any environmental pressures, Option HO5 could suitably manage and protect the landscape character and ecological connectivity in order to address any potential issues with a higher level of growth.

Growth option HO5 should be re-assessed as a preferred growth option, with the addition of land at Nouale Lane as an allocation for residential development or habitat mitigation within the draft Plan.

Taylor Wimpey recognises the SA has assessed alternative growth strategies. However, the concern is whether the assessment and reasons for selection adequately address the potential contribution of all sites and their individual circumstances. The requested modification is a reassessment of that opportunity, with the resulting housing provision and allocations reflected in Policies SP3 & SP29 where supported by the evidence. The potential for environmental mitigation at Nouale Lane should also be assessed on its own merits.

There has been no robust assessment of the 40 homes per annum figure (or alternatives) in either the SA or other supporting evidence. It is our view that this level of housing provision is insufficient and needs to be increased. This can be secured without harming the overarching aims of the Park or resulting in unrestricted growth by utilising Towns surrounding the authority, such as Ringwood, to bolster the much needed housing provision.

This representation on behalf of Taylor Wimpey raises very similar points to the representations made on behalf of Seaward Homes, Pennyfarthing Homes and Gervis Property.

As outlined above, the assessment of reasonable alternatives needs to factor in the Authority’s legal duty to foster the socio-economic well-being of communities within the National Park. Large settlements like Ringwood and Lymington were consciously left out of the boundary of the New Forest National Park and this is relevant to the consideration of reasonable alternatives to meeting housing needs.

At this stage the Authority is not convinced of the need for additional SA/SEA work on reasonable alternatives, as options HO1 – HO8 in the Regulation 19 Local Plan SA/SEA meet the needs of the regulations and are pitched at the appropriate level for the Local Plan-making process.

Turley (obo Pennyfarthing Homes)

The SA that accompanies the draft Plan includes a reasonable alternative growth option (HO5) that encompasses growth around the main towns abutting the National Park. However, the ranking of outcomes against SA objectives is counterintuitive to the conclusions drawn.

Turley have outlined soundness concerns under the positively prepared, justified and consistent with national policy tests. Further opportunities to meet more of the area’s unmet needs for housing, particularly affordable housing should be explored, before finalising the housing requirement, spatial strategy and land supply designations. The SA should be revisited, and suitable opportunities to meet further needs, where consistent with the framework read as a whole, be explored through main modifications.

This representation on behalf of Pennyfarthing Homes raises very similar points to the representations made on behalf of Seaward Properties, Taylor Wimpey and Gervis Property.

The representation from Turley (on behalf of Pennyfarthing Homes) misrepresents the conclusions of the SEA/SEA assessment of options – option HO5 involves a higher level of development than options HO1 and HO2 and this is why the assessment concludes that transport and climate change impacts will increase.

At this stage the Authority does not believe there is a need for additional SA/SEA work on reasonable alternatives, as options HO1 – HO8 in the Regulation 19 Local Plan SA/SEA meet the needs of the regulations and are pitched at the appropriate level for the Local Plan-making process.

Black Box Planning (obo Gervis Property)

The Regulation 19 Sustainability Appraisal (SA) (July 2026) appraises eight housing growth options (HO1 – HO8). This includes Option HO5, which combines the preferred strategy (Option HO2) with around 200 dwellings on land within the NPA’s adjoining settlements outside it. Although Option HO5 is recognised as a reasonable alternative, the SA does not demonstrate that the preferred strategy is justified

The options exclude sustainable villages which straddle the boundary. No option considers proportionate growth at a village whose community lies partly within the Park. Bransgore falls between the two categories and is not captured by either.

The SA has not appraised the clear reasonable alternative of the preferred strategy supplemented by proportionate growth at sustainable boundary villages, including Bransgore. It has not explained why Option HO5 was rejected, meaning the NPA cannot demonstrate that the preferred strategy is the most appropriate when considered against the reasonable alternatives, as required by the ‘Appropriate’ test of soundness.

This representation on behalf of Gervis Property raises very similar points to the representations made on behalf of Pennyfarthing Homes and Taylor Wimpey.

The village of Bransgore was excluded from the boundary of the New Forest National Park when the final boundary was confirmed in 2005. It does not ‘straddle the boundary’ – the main built elements of the village were all excluded from the legally established boundary. We do not agree that there should be a ‘Bransgore option’ as it is already adequately covered by option HO5.

At this stage we do not believe there is a need for additional SA/SEA work on reasonable alternatives, as options HO1 – HO8 in the Regulation 19 Local Plan SA/SEA meet the needs of the regulations and are pitched at the appropriate level for the Local Plan-making process.

Respondent Main Issues Raised How the representations have been taken into account
Hampshire County Council

Hampshire County Council supports the Submission Draft Local Plan objective of strong and distinctive local communities and acknowledges that the Growth Strategy Option B (as selected from the Sustainability Appraisal Report) addresses this, by considering controlled development in existing defined villages and newly defined villages based on service provision. The objective of sustaining the vitality and viability of smaller settlements is acknowledged.

The County Council acknowledges the planned growth across the National Park within the plan period is relatively modest (including a total of 285 dwellings across the allocated sites). The Plan’s evidence does not robustly demonstrate however that the proposed site locations are accessible in terms of sustainable transport options.

Whilst the County Council recognises that the scale of development may not justify the preparation of a full Transport Assessment, the absence of a proportionate assessment of the likely transport impacts means that the evidence is not adequate in demonstrating that the proposed growth can be accommodated without adverse effects on the transport network or an increase in car-dependent travel patterns.

The National Park Authority has prepared a Transport Topic Paper on the transport and accessibility issues raised by Hampshire County Council in their representations.

The site assessment process considered proximity to services & facilities and looked at public transport options in the vicinity but recognising that these are relatively limited in most villages across the National Park. In addition, the SA framework covers accessibility, movement, and car dependency.

The local plan has been amended to include reference to both Hants & Wilts LTP4 and to refer to Healthy Streets and promotion of active travel.

JJP Planning (obo Netley Marsh Parish Council) and local residents

The published Sustainability Appraisal (“SA”) does not demonstrate how reasonable alternatives for meeting the Travelling Showpeople requirement were assessed.

Although SP50’s effects are considered within the appraisal, no equivalent comparison is identifiable for Showpeople provision.

Potential alternative approaches include the consideration of other parcels of land, provision across smaller sites, and expansion or intensification of existing yards. The published assessment does not explain which approaches were considered reasonable alternatives, compare their effects or establish why reliance on LAA62 was preferred.

In summary, the legal-compliance objection is that the required assessment of reasonable alternatives, and the reasons for preferring the selected approach, have not been demonstrated.

The NFNPA has considered reasonable alternatives to meet identified need for travelling showpeople. This is evidenced by the following:

  • Policy DP49 in the Reg 19 draft Local Plan has been revised to support the appropriate extension and/or intensification of existing sites as an option to meet need.
  • The Authority considered all of the ‘Call for Sites submissions that were put forward for travelling showpeople use. Other sites were discounted on HRA grounds.
  • Policy SP49 provides a criteria-based framework against which proposals for Gypsies, Travellers and Travelling Showpeople accommodation can be assessed. This includes sites identified by the travelling showpeople community themselves.

Consequently, no reasonable alternative site options were identified that required comparative assessment through the SA.

4.4 No representations were explicitly received to the findings of the Habitats Regulations Assessment, albeit some comments were received in relation to impact of site allocations/habitat mitigation requirements and these have been summarised as part of the respective chapter summaries below.

Local Plan Chapters - Schedules of Representations

4.5 The following schedules provide an overview to the number of representations per policy, together with a summary of comments made and how the representations have been taken into consideration and whether any changes to the local plan are proposed. Where a proposed modification is considered appropriate this is shown and labelled with its reference as set out in the Submission Schedule of Proposed Modifications. Statutory consultees and known organisations are named. The schedules include data on whether policies are legally compliant and sound.

4.6 Accordingly, this statement demonstrates compliance with the requirements of Regulation 22 (1)(c) and that consultation on the preparation of the pre-submission Local Plan Review and supporting documents, including the Sustainability Appraisal, Habitats Regulations Assessment, and the submission policies map, has been undertaken in accordance with the relevant Regulations, the adopted Statement of Community Involvement (SCI) and Local Development Scheme (LDS) in place at the time.

N.B. The following schedules show total representations for each chapter/policy and, where provided, respondents’ views on legal compliance and soundness. These figures may not tally, as not all respondents answered these questions.

Local Plan Chapter: Chapter 1 Introduction and Background

Total Number of representations received: 8

No of respondents who confirmed the policy is:

  • Legally compliant: Yes 5; No 1
  • Sound: Yes 2; No 4
Respondent Main Issues Raised How the representations have been taken into account
Dorset Council

Dorset Council accepts the locally derived housing needs assessment as a realistic estimate of what can be delivered within the park and therefore the Council supports the departure from the Standard Method for calculating Local Housing Need. In response to the request from NFNPA to assist in meeting housing needs, Dorset Council faces a significant housing delivery challenge itself.

With regard to gypsies and travellers it is acknowledged that the NFNPA is not able to meet its own identified need through site allocations and is proposing a criteria-based policy to respond to proposals. Dorset Council similarly has a significant need for Gypsy and Traveller and Travelling Showpeople accommodation and a limited number of available sites to meet this need. It is therefore unlikely that Dorset Council will have capacity to accommodate unmet Gypsy & Traveller or Travelling Showpeople needs arising from the National Park.

The Council strongly supports the protection and enhancement of the New Forest's internationally and nationally designated habitats and welcomes continued joint working on mitigating recreational impacts arising from development, and support the provision of Suitable Alternative Natural Greenspace (SANG) as part of habitat mitigation strategies within the National Park where this represents the most effective mitigation solution, including potentially for developments located outside of the Park.

Support noted and welcomed

See Cooperation Statement and Statements of Common Ground.

Wiltshire Council Wiltshire Council and the NPA have maintained regular dialogue on the agreed cross-boundary issues between the two authorities. See Cooperation Statement and Statements of Common Ground
Redlynch Parish Council

Make various comments in relation to the Local Plan and supporting evidence.

Key focus is strong objection to the proposed spatial strategy and major greenfield site allocations in the l parish—namely Policy SP40 (Land to the south of Hamptworth Road, Landford) and Policy SP41 (Land to the east of The Ridge, Redlynch).

See responses under respective parts of the local plan.
Individual Concern over impacts of developments and lack of infrastructure.

Policies allocating sites for development refer to the infrastructure required and any habitat mitigation needed.

See Spatial Strategy and Settlement Hierarchy Topic Papers and Infrastructure Delivery Plan.

Individual Reference to "net zero with nature” in terms of making Landford a defined village will increase carbon emissions from new housing and increase car usage. See Spatial Strategy and Settlement Hierarchy Topic Papers
Individual Refers to an arbitrary 30% rule in relation to the expansion of villages and requests development should reflect need rather than an arbitrary percentage. Unclear as to what the 30% refers to – in any event the National Park has significant development needs and new homes are needed to stabilise communities and rebalance the housing stock – see the New Forest Housing Needs Assessment (Iceni, 2025) and New Forest Housing Needs Sensitivity Report (Iceni, 2026).
Individual Traditional Architecture Design Codes should be a central component across the whole local plan. Comment noted. Policies on design and placemaking are covered by Policies DP26 Local Distinctiveness, DP27 Design Principles and DP28 Residential Character of the Defined Villages. In addition, further design guidance is available through the National Model Design Code.

Local Plan Chapter: Chapter 2 Profile of the New Forest

Total Number of representations received: 3

No of respondents who confirmed the policy is:

  • Legally compliant: Yes 3
  • Sound: Yes 2; No 1
Respondent Main Issues Raised How the representations have been taken into account
New Forest Youth Board Para 2.2 the addition of a breakdown showing the age ranges of people within the National Park would allow for a better understanding of the needs of the population.

Agree this would add clarity to context of planning for new development in the National Park.

Proposed Modification PSM5

Area and population

2.2 The New Forest National Park covers 567 square kilometres (220 square miles). In 2022 the National Park had a population of 34,931 people and with around 62 people per square kilometre it is the second most densely populated British National Park after the South Downs. In terms of population breakdown by broad age cohorts this is as follows (with comparative data for South East England):

  • 0-15 years 12.8% (18.6%)
  • 16-24 years 7.5% (9.9%)
  • 25-49 years 20.1% (31.9%)
  • 50–64 years 25.8% (19.9%)
  • 65+ years 33.8% (19.7%)

Renumber as 2.3 The housing stock amounts to 15,503 dwellings (New Forest Housing Needs Assessment, Iceni, 2025). The main settlements of Ashurst, Brockenhurst, Burley, Cadnam, Landford, Lyndhurst and Sway have between 1,000 and 3,500 residents. Average house prices in the New Forest are significantly higher than surrounding areas, with an average property price more than 12 times the average annual earnings. This means the New Forest has the highest average house price of any UK National Park.

Individual Para 2.11 request the 3 additional Smaller Defined Villages are named Para 2.11 sets the context for the smaller defined villages, but these are then set out in Policy SP3. No further changes are considered necessary.
Individual Traditional Architecture Design Codes should be a central component across the whole local plan. Comment noted. Policies on design and placemaking are covered by Policies DP26 Local Distinctiveness, DP27 Design Principles and DP28 Residential Character of the Defined Villages. In addition further design guidance is available through the National Model Design Code.

Local Plan Chapter: Chapter 3 Vision and Objectives

Total Number of representations received: 12

No of respondents who confirmed the policy is:

  • Legally compliant: Yes 8
  • Sound: Yes 2; No 7
Respondent Main Issues Raised How the representations have been taken into account
New Forest Association Request an additional bullet is added to para 3.4 Key Challenges making reference to the issue that the New Forest National Park has legally committed to halving carbon emissions by 2030, and to achieve net zero and net carbon sink by 2050. Noted. Para 5.11 within the Climate Change chapter of the local plan specifically mentions this matter in this context. Paragraph 3.4 is more general and refers to ‘meeting net zero targets’. The Authority does not consider any further changes are necessary.
New Forest Youth Board Reference should be made to the ensuring the socio-economic needs of young people within the National park as young people are the part of the population which will be custodians of the National Park on a longer-term basis. Para 3.4 refers to the key challenges and covers both housing and employment matters in the context of a National Park with general references to local people – it is not considered necessary to make specific reference to young people.
Turley (obo Pennyfarthing Homes)

Question the social and economic consequences of not meeting needs where there is an ageing and declining economically active population, which would preclude attainment of the local plans strategic objectives.

Promote land North-East of Pennywell Gardens, New Milton for consideration.

Application of the spatial strategy and delivery of the associated local plan allocations are considered sufficient to meet the needs of the National Park to achieve the strategic objectives expressed. Accordingly, no further sites are considered necessary.

See Spatial Strategy, Settlement Hierarchy topic papers.

Individuals Request deletion of Landford/Nomansland from the list of defined villages in Policy SP3. This representation is addressed under the response to draft policy SP3
Individual Request reference to the iconic New Forest Pony is amended to read ‘protect and ensure the safety of the New Forest Pony’, due to the number being injured/killed on the roads. Reference to the iconic New Forest Pony reflects the Special Qualities of the National Park which are a key part of implementation of the Park’s Partnership Plan which is referenced throughout the local plan, acknowledging the links between the two documents.
Individuals

Changes requested to the Policies map:

Defined Village Boundary for Landford, to include the area on the Lyndhurst Road, from the river Blackwater to the A36 and down the A36 from the Poacher pub to Glebe Lane. This triangle of land already has a number of industrial units and form part of the village.

Cadnam - Bartley defined village to include Rose Cottage, Chinham which forms part of the built-up area within the settlement of Bartley.

See Settlement Boundary Review Topic Paper for the rationale to the proposed settlement boundaries.

Local Plan Policy: Policy SP1 Supporting Sustainable Development

Total Number of representations received: 14

No of respondents who confirmed the policy is:

  • Legally compliant: Yes 4; No 3
  • Sound: Yes 3; No 5
Respondent Main Issues Raised How the representations have been taken into account
Lucid Planning Ltd (on behalf of Pennyfarthing Homes);
Luken Beck (on behalf of Seaward Properties);
Gillings Planning obo Trustees of the Barker-Mill Estates;
Copythorne Parish Council;
Support the policy approach Support welcomed.
Laister Planning Ltd on behalf of Paultons Park Support the overarching objective of SP1 and do not seek to dilute the statutory protection afforded to the New Forest National Park. But the Policy fails to recognise role of sustainable tourism in contributing to the enjoyment and understanding of the national park or the wider economic benefits, in line with the NPPF 2026. Requests criterion e) is modified to read ‘avoids adverse effects on the integrity of the protected habitats of the New Forest, including its coastline, and incorporates appropriate measures to avoid, mitigate and, where necessary, compensate for adverse impacts and to provide for habitat enhancement proportionate to the nature and scale of the development’. The Local Plan is being submitted under the transitional arrangements and will be examined under NPPF 2024. NFNPA does not consider the changes proposed are necessary given the statutory purposes of the National Park.
Boyer Planning obo Taylor Wimpey UK Ltd Question whether the local plan has identified and properly assessed the opportunities to deliver appropriate housing including from sites adjoining settlements outside the National Park. This matter is addressed in the Spatial Strategy Topic Paper. The Sustainability Appraisal also considered ‘reasonable alternatives’ to meet housing needs, including development on the periphery.
Fisher German (on behalf of National Grid Electricity Transmission (NGET)) Requests the NGET transmission assets, including overhead lines, underground cables, access routes and substations are safeguarded and to enable future network expansion as appropriate. Noted. The Infrastructure Delivery Plan notes that National Grid at present does not indicate any major upgrade proposals within the National Park area.
Individual

Amend b) to refer to drought and wildfires

Amend e) add reference to re-creating salt marsh to halt erosion and protect the coast

The changes proposed are not directly linked to development and the planning system and are more appropriately addressed in other documents (e.g. the National Park Partnership Plan).
Individual Include reference to ‘doctors’ in the policy. Policy SP1 refers to in a) local infrastructure provision which would include doctors.
Individual Landford/Nomansland should not be made a defined village and 'Major' development must not occur. The responses to policies SP2 and SP3 and address the proposed settlement hierarchy and major development within the National Park.
Individual The premise of sustainable development that "includes appropriate new housing to address local needs" is flawed and not fit for purpose. The evidence on local housing needs is set out in the New Forest Housing Needs Assessment (Iceni, 2025) and New Forest Housing Needs Sensitivity Report (Iceni, 2026).
Individuals Support the recognition of Cadnam-Bartley as a smaller defined villages and provision of a settlement boundary for Cadnam-Bartley is welcomed. Specific changes to the settlement boundary are requested. Support noted. The proposed boundary for Cadnam - Bartley was reviewed in response to representations to the Regulation 18 part 2 consultation – no further changes are considered necessary.

Local Plan Policy: Policy DP2 General Development Principles

Total Number of representations received: 12

No of respondents who confirmed the policy is:

  • Legally compliant: Yes 4; No 3
  • Sound: Yes 2; No 5
Respondent Main Issues Raised How the representations have been taken into account
Environment Agency Support reference to mitigation and adaptation to climate change, including how flood resistance and resilience is incorporated into building design. Support noted and welcomed.
Copythorne Parish Council Support but question use of term ‘unacceptable’ as this is open to interpretation and how will the aims of the policy be measured objectively. Planning decisions are made through a balanced assessment of the development plan, national policy and other material considerations. The Local Plan provides a comprehensive policy framework for making these judgements within the National Park context.
Brockenhurst Parish Council All development must be appropriate & sustainable and not cause pollution. These matters are covered by the policy.
Godshill Parish Council Request the Sandy Balls Holiday Village is included as a site-specific policy. The Authority does not consider that a separate policy for Sandy Balls Holiday Village is required. The policies within the draft Local Plan on heritage, major development, tranquillity and dark skies, holiday parks, and sustainable tourism provide sufficient policy coverage.
Individuals Policy should include reference to fire and traffic matters considering local wildfire incident in summer 2026; makes no reference to cross boundary matters particularly where settlements fall within the same parish but lie outside the National Park. Noted. Cross boundary matters are set out in the Authority’s Cooperation Statement and individual Statements of Common Ground. The Authority’s Local Plan cannot provide policy coverage for settlements outside the National Park.
Laister Planning Ltd on behalf of Paultons Park; Boyer Planning obo Taylor Wimpey UK Ltd Policy DP2 should be applied proportionately to the scale, location and impacts of development. Policy DP2 is expressed to allow for flexibility – no further changes are considered necessary.
Individual Proposed site in Landford is major development and will not comply with DP2. Allocation of the site in Landford is in response to the revised spatial strategy and the need to identify additional land for development to meet the development needs of the National Park. The local plan should be read as a whole and accordingly all policies will apply as deemed appropriate to consider planning applications, including those on allocated sites. The proposed site allocation in Landford is not considered to be major development when considered against paragraph 190 of the NPPF (2024).
Individual Para 4.15 References to safer streets need to consider reduction in speed limits to 20MPH Noted

Local Plan Policy: Policy SP3 Spatial Strategy

Total Number of representations received: 225

No of respondents who confirmed the policy is:

  • Legally compliant: Yes 113; No 40
  • Sound: Yes 7; No 142
Respondent Main Issues Raised How the representations have been taken into account
Hampshire County Council

HCC supports the Submission Draft Local Plan objective of strong and distinctive local communities and acknowledges that the Growth Strategy Option B (as selected from the Sustainability Appraisal Report) addresses this, by considering controlled development in existing defined villages and newly defined villages based on service provision. The objective of sustaining the vitality and viability of smaller settlements is acknowledged.

HCC acknowledge that the scale of development may not justify the preparation of a full Transport Assessment, the absence of a proportionate assessment of the likely transport impacts means that the evidence is not adequate in demonstrating that the proposed growth can be accommodated without adverse effects on the transport network.

The Settlement Hierarchy Topic Paper August 2026 should set out what transport evidence has been used to inform the selected spatial option. Transport data such as DfT Connectivity Tool could be used to evaluate the accessibility of different locations.

Support noted and welcomed

The local plan has been amended to include reference to both Hants & Wilts LTP4 and to refer to Healthy Streets and promotion of active travel. In addition the SA framework covers accessibility, movement, and car dependency. The local plan has been prepared prior to the publication of the DfT Connectivity Tool.

The site assessment process considered proximity to services & facilities and looked at public transport options in the vicinity, while recognising these are relatively limited in most villages across the National Park. The Spatial Strategy, and Settlement Hierarchy Review, Transport Topic Papers provide more detail.

Wiltshire Council Identifying Landford-Nomansland and Redlynch as Smaller Defined Villages is considered reasonable given their size and number of services/facilities. Support from the statutory Housing, Education, Highway and Lead Local Flood Authority for the Wiltshire area of the Park noted and welcomed.
Woodgreen Parish Council Unclear as to why Redlynch is considered appropriate for new development – request deletion of the proposed allocation (Policy SP41) The proposed allocation at Redlynch is not considered to conflict with the National Park Authority’s statutory purposes or the duty to support the social and economic wellbeing of Park communities. The evidence on local housing needs is set out in the New Forest Housing Needs Assessment (Iceni, 2025) and New Forest Housing Needs Sensitivity Report (Iceni, 2026) – see also Spatial Strategy, Settlement Hierarchy Review and Settlement Boundary Review Topic Papers.
Black Box Planning on Behalf of Gervis Property Company Ltd Promote Land at Bransgore (land adjoining Meyrick Close, (‘Site A’) and the land bound by Burley Road and Ringwood Road, (‘Site B’)) for consideration, on the basis that settlements that straddle the National Park boundary have not been assessed on a consistent basis. It is not considered that the sites at Bransgore represent suitable places for development and do not align with the Plan's spatial strategy. See Spatial Strategy and Settlement Hierarchy Review Topic Papers.
Lucid Planning Ltd on behalf of Pennyfarthing Homes

Support the wider approach and allocation of The Ridge site at Redlynch (SP41).

However, the Plan has not been positively prepared as it will not address the area’s needs, and the restrictive approach on housing numbers is not justified. It is right that a settlement hierarchy is to be introduced and followed, with all referenced settlements receiving a clear settlement boundary to help guide development.

The local plan conflicts with NPPF 2026 Policy S5 as it does not facilitate possible limited infilling within groups of houses.

Support noted and welcomed

The evidence on local housing needs is set out in the New Forest Housing Needs Assessment (Iceni, 2025) and New Forest Housing Needs Sensitivity Report (Iceni, 2026) – see also Spatial Strategy, Settlement Hierarchy Review and Settlement Boundary Review Topic Papers.

The Local Plan is being submitted under the transitional arrangements and will be examined under NPPF 2024.

Luken Beck (on behalf of Seaward Properties); Boyer Planning obo Taylor Wimpey UK Ltd Policy SP3 fails to recognise the relationship of the National Park with its adjoining sustainable settlements, as the strategy only seeks to focus development within National Park settlements, rather than on sites which are in the National Park but adjoin neighbouring sustainable settlements, outside of the National Park. The option of considering development around the periphery of the National Park was tested through the SA reasonable alternatives (option HO7). Whilst it was concluded this option avoided some of the key sensitive areas of the National Park it was less clearly linked to delivering benefits to the communities within the National Park and hence was not taken further within the spatial strategy.
Tor&co (on behalf of the Cadland Estate) Support the provision made within Policy SP3 for meeting local employment needs through the strategic allocation of ‘Land north of Fawley Waterside’ under Policy SP5. Support noted and welcomed
Gillings Planning obo Trustees of the Barker-Mill Estates Support the identification of Ashurst as a defined settlement. Support noted and welcomed
Evans Jones obo Fawley Waterside Ltd ("FWL")

FWL is pursuing employment-led regeneration of the former Fawley Power Station and supports the Plan’s recognition of the Solent Freeport opportunity.

Policies SP3 and SP5 are not justified as the evidence does not demonstrate that historic net completions establish a recurring need for a single strategic allocation. The policies are not effective because the realistic scale and form of development depend upon unresolved remediation, viability, access, infrastructure and ownership matters. The strategy has also not been shown to be consistent with national policy concerning major development and the protection of National Parks.

Request deletion of SP5 and amend SP3 so that it does not rely on SP5 to meet the National Parks employment needs. Recognise that strategic and modern-economy opportunities can be accommodated through employment-led regeneration of the former power station outside the National Park, subject to the applicable development plan.

Support noted and welcomed

The recommendations in the Economic Needs Assessment identify a need of 13,000sq.m of employment. Given the limited opportunities across the National Park to meet this quantum of growth through existing routes of redevelopment and extension/intensification on existing sites, accordingly, the local plan allocates the land north of Fawley Waterside, (Policy SP5) which falls within the Southampton Water Freeport tax site for employment purposes. The Sustainability Appraisal of the Regulation 19 Submission draft Local Plan considered the reasonable alternatives to meeting employment needs. Furthermore, redevelopment of the site provides an opportunity to secure appropriate investigation, remediation and long-term environmental improvement in accordance with national planning policy and does not conflict with the statutory purposes of the National Park.

NFNPA does not consider the changes proposed are necessary given the demonstrable need for employment land within the National Park.

The New Forest Youth Board The introduction of new smaller defined villages to allow additional development within local areas is supported, as it would support local young people to stay within the National Park. Support noted and welcomed
Individual Need to add a definition of ‘major development’ in the context of a National Park to the glossary to clarify the scale of development referred to when compared with NPPF. Disagree – the footnote to para 190 of NPPF (2024) is clear that whether a proposal is ‘major development’ in National Parks is a matter for the decision maker taking into account the nature, scale and setting of the proposal. Para 4.32 refers to major development being that of more than local significance allowing for a judgement to be made in the context of the proposal.
Individual Should consider brownfield sites before greenfield Noted – the Authority has explored the use of brownfield sites through its Call for Brownfield Sites and maintains a brownfield register. Where compliant with other development plan policies brownfield sites have been allocated for development in the local plan.
Individuals

Plan fails to reference how neighbouring local plans will impact on the National Park in terms of transport, tranquillity and access to services for communities.

Concern about large scale developments outside of the National Park impacting on it.

Section 245 of the Levelling Up & Regeneration Act 2023 require ‘relevant bodies’ to seek to further the statutory National Park purposes in undertaking their functions. This strengthened duty applies to a wide range of bodies, including national park authorities, constituent local authorities and statutory undertakers. Therefore, proposals outside but potentially impacting on the National Park will be required to comply with this new duty. See signed Statement of Common Ground with neighbouring planning authorities.
Individuals Requests the policy allows for self and custom house building outside of defined settlement boundaries where they can satisfy National Park purposes. Policy SP3 establishes a spatial strategy for the National Park, Policy SP48 allows for self and custom build housing where these comply with other development plan policies.
New Forest Association

Do not agree with the definition of smaller villages and how these have been determined

Request amendments to paras 4.49, 4.52

See - Spatial Strategy, Settlement Hierarchy Review and Settlement Boundary Review Topic Papers. The Authority does not consider the suggestions to the supporting text are necessary.
Landford Parish Council; Individuals

Object to Landford-Nomansland being designated as a smaller defined village in the settlement hierarchy and there is no local need to justify the additional homes.

Comments cover the following matters: Lack of evidence to justify the approach taken; villages only have basic facilities; limited public transport; no need for additional housing; existing flooding, lack of infrastructure; sewerage capacity and road constraints/capacity; impact on landscape character, dark skies, ecology; lack of employment opportunities; combining of Landford and Nomansland into a one village whereas they are two distinct communities; query the settlement boundary when compared to that within the previous Salisbury District Plan which did not merge the two communities. Object to the housing allocation under Policy SP40. Request Landford-Nomansland be removed from Policy SP3 and Policy SP40 deleted.

The National Park has a significant housing need and insufficient brownfield land to meet it, so greenfield site allocations are proposed. New homes are needed to support local communities and services and meet identified local needs - see the New Forest Housing Needs Assessment (Iceni, 2025) and New Forest Housing Needs Sensitivity Report (Iceni, 2026).

The option of distributing development evenly across the National Park, without applying a settlement hierarchy, was examined through the Sustainability Appraisal (Option D). This approach was discounted because it would generate higher infrastructure requirements and environmental impacts, while failing to deliver clear or coherent strategic benefits.

The Authority has undertaken a review of the settlement hierarchy and settlement boundaries see Spatial Strategy, Settlement Hierarchy Review and Settlement Boundary Review Topic Papers. The proposed Landford and Nomansland boundary is similar to the previous single settlement boundary that existed under the previous Salisbury District Local Plan (2003).

Individuals The overall spatial strategy does not sufficiently demonstrate that the proposed distribution and scale of development can be supported by the infrastructure, transport, services and community facilities available within the settlements identified for growth. Policy SP3 will negatively affect infrastructure of the area. The Authority has undertaken a review of the settlement hierarchy and settlement boundaries see Spatial Strategy, Settlement Hierarchy Review and Settlement Boundary Review Topic Papers. An Infrastructure Delivery Plan has been prepared to support implementation of the local plan and the allocations included.
Individual Supports the identification of Redlynch as a Smaller Defined Village and the principle of directing an appropriate level of new development to the settlement. Promotes an additional site for consideration (LAA53). The August 2026 SLAA assessed site LAA53 and concluded it was available and achievable, but it was rejected on suitability/landscape grounds.
Individuals Object to Redlynch being designated as a smaller defined village in the settlement hierarchy and the allocation of a site for development on the basis of: Increase sewage and surface water runoff; additional traffic The Authority has undertaken a review of the settlement hierarchy and settlement boundaries see Spatial Strategy, Settlement Hierarchy Review and Settlement Boundary Review Topic Papers
Southern Planning Practice Supports identification of Cadnam-Bartley as a smaller defined village and promotes The Old Brickyard for consideration on the basis the local plan has a significant gap between assessed housing need and planned supply. Support noted.
Individual Supports settlement boundary around Cadnam – Bartley Support noted and welcomed.
Atlas Planning Group obo landowner; Individual

Request changes to the proposed Cadnam – Bartley settlement boundary to include residential and commercial properties at Grove Farm

Representation also seeking the inclusion of land at Rose Cottage, Chinham Road, Bartley

The Spatial Strategy, Settlement Hierarchy Review and Settlement Boundary Review Topic Papers set out the rationale for the proposed settlement boundary for Cadnam - Bartley.
Individuals

Designation of Cadnam-Bartley as a ‘smaller defined village’ is deeply flawed for the following reasons:

  • Does not create a village, but simply connects areas of built development; facilities and services are limited; non-existent employment opportunities and limited public transport.
  • Purely designed to enable the land to the west of Winsor Road - as set out in SP39 to then become eligible for development.
  • Object to allocation SP39 on basis transport and drainage impacts; lack of infrastructure; landscape harm

The Authority has undertaken a review of the settlement hierarchy and settlement boundaries see Spatial Strategy, Settlement Hierarchy Review and Settlement Boundary Review Topic Papers

The proposed Cadnam – Bartley boundary and Winsor Road allocation are not considered to conflict with the National Park Authority’s statutory purposes or the duty to support the social and economic wellbeing of Park communities.

The Authority intends to retain both Cadnam – Bartley as a defined smaller settlement and the proposed allocation under Policy SP39 (see further detail comments under Policy SP39).

Individual Plan is unsound because it focusses only on certain defined villages and does not consider Bashley which is one of the most viable options. The Authority has undertaken a review of the settlement hierarchy and settlement boundaries see Spatial Strategy, Settlement Hierarchy Review and Settlement Boundary Review Topic Papers.
Haydon Tyres Agree with the latest proposed settlement policy boundary changes (Cadnam-Bartley) Noted

Local Plan Policy: Policy SP4 Major development in the National Park

Total Number of representations received: 5

No of respondents who confirmed the policy is:

  • Legally compliant: No 2
  • Sound: No 3
Respondent Main Issues Raised How the representations have been taken into account
Copythorne Parish Council Support reference to maximising transport opportunities when considering major developments – but concern that true impacts from major developments cannot be truly mitigated against. Support noted, the policy has been prepared within the context of the statutory purposes of the National Park and paragraph 190 of the NPPF (2024) on ‘major development’.
Brockenhurst Parish Council Major development only to be permitted when exceptional need has occurred nationally and any mitigation to the development has been agreed. Noted.
Laister Planning Ltd on behalf of Paultons Park SP4 is overly restrictive to be applied to existing established tourist attractions. Proposed modifications suggested including that tourism development is not treated as major development.

Para 4.30 – 4.33 set out the background to Policy SP4 and reinforce established national planning policy that includes a clear presumption against major new development in national parks.

The Authority considers that Policy SP62 Sustainable Tourism Development covers the matters raised by this representation, as it includes specific reference to the enlargement and diversification of existing major tourist attractions. The Authority does not consider any further modifications are therefore necessary to Policy SP4, however for clarity the following proposed additional text is suggested to cross reference to Policy SP62 in the case of the existing larger scale tourism attractions.

Proposed modification PSM7

Supporting text:

Para 4.32 Major development is development of more than local significance (i.e. it would exceed the local scale of development needed to address the socio-economic needs of the New Forest’s 35,000 residents) and which would have a long-term impact on the landscape, wildlife or cultural heritage of the National Park because of its scale and form. This can include major residential and commercial development (including tourism), significant infrastructure projects and power generation, including renewable energy. With regard to existing major tourist attractions, Policy SP62 of the local plan allows for the enlargement and diversification of such facilities where they are supported by Whole Estate Plans to ensure that they remain appropriate and proportionate in the context and setting of a National Park.

Boyer Planning obo Taylor Wimpey UK Ltd The Plan should take account of a proposal’s nature, scale and setting and its potential effects on the statutory purposes. The draft Local Plan already provides sufficient clarity on what constitutes major development within the context of National Park purposes and NPPF. No further amendments are considered necessary.

Local Plan Policy: Policy SP5 Land to north of Fawley Waterside

Total Number of representations received: 7

No of respondents who confirmed the policy is:

  • Legally compliant: Yes 3
  • Sound: Yes 1; No 2
Respondent Main Issues Raised How the representations have been taken into account
Environment Agency Supportive of points d) and e) within this policy Support noted and welcomed.
New Forest District Council

NFDC supports NFNPA’s ambition to plan positively for the future of the site within the National Park and welcomes the NFNPA’s intention to meet its identified employment needs within the National Park Plan Area.

NFDC welcomes the additional work undertaken by NFNPA through its Sustainability Appraisal and Strategic Land Availability Assessment since the Regulation 18 draft Local Plan consultation in November 2025 to set out and assess alternative spatial and site options for addressing employment need including assessing the option of more dispersed distribution across a broader range of settlements within the National Park.

NFDC has concerns that the NFNPA strategy for meeting its identified employment need on the delivery of this singular proposed site allocation is a risk particularly if the site does not come forward. Accordingly, the identified employment need in the National Park Plan Area may not be met within the National Park as no other employment allocations in/around other National Park settlements are proposed. Policy SP5 is therefore not sound.

NFDC request a proposed modification to Policy SP5, as an additional site-specific criterion: “the development should demonstrate how the provision of access and infrastructure for the application area can be part of a comprehensive approach for the Fawley Waterside tax site as a whole. Development proposals should also demonstrate how the development will be phased and delivered without prejudicing future development of the wider Fawley Waterside Solent Freeport tax site”.

Support noted and welcomed

The spatial options for employment development have been considered through the Sustainability Appraisal process. Not all employment needs across the Plan period will be met on this site. For example, draft Local Plan policies support the extension and redevelopment of existing and new small-scale employment sites within and adjacent to existing settlements across the National Park, particularly the seven Defined Villages.

Employment needs will be addressed through a combined approach: dispersed, criteria-based support for employment sites alongside a strategic allocation north of Fawley Waterside. This approach will provide flexibility over the plan period while recognising the location’s strategic importance.

The Authority has considered the proposed changes submitted by NFDC and consider there are merits in recognising that land within the National Park forms part of a much larger site.

Proposed Modification PSM8

Supporting text:

4.36. Land at Fawley Waterside, is one of seven ‘tax sites’, covers 70 acres of land. The site has a dedicated dock and there is to a focus on marine innovation, port-centric manufacturing and energy sectors. The site lies partially within the National Park, with the commercial opportunity spread over 360,000 square metres on the site of the former Fawley Power station and adjacent land.

New para

4.37 Given the whole site lies partially within the National Park, there is a need for development of land within and outside to be considered in a comprehensive manner with a particular regard to access and supporting infrastructure, to ensure any mitigation requirements are duly identified and delivered in a timely manner.

Renumber remaining paragraphs.

Policy SP5 amend criterion g) to read
g) a masterplan for the whole site to ensure redevelopment is brought forward in a coordinated manner, comprehensive redevelopment is achieved and its impacts are fully mitigated, taking into consideration the wider opportunities on the Fawley Power Station site.

Copythorne Parish Council Support, but have concerns about traffic congestion – the need for improved transport links should be reinforced. Support noted, the policy has been expressed to require transport assessments and to include required mitigation to address transport impacts.
Waterside Cycling Action Group A cycle/pedestrian facility should be constructed to allow employees to cycle/walk to work. A bus service should also be considered to allow those employees living in the Waterside to travel to work by bus, if they so choose. Policy SP5 refers to the need for c) provision of opportunities for active travel linking the site to surrounding settlements, employment areas, and public transport networks”. No further changes are considered necessary.
Tor&co (on behalf of the Cadland Estate) Support the policy and allocation. Landowner support noted and welcomed

Local Plan Policy: Policy SP6 Infrastructure and developer contributions

Total Number of representations received: 6

No of respondents who confirmed the policy is:

  • Legally compliant: Yes 1; No 1
  • Sound: Yes 1; No 1
Respondent Main Issues Raised How the representations have been taken into account
NHS Property Services NHSPS welcome the inclusion of health in the list of infrastructure which development proposals are expected to make provision for. Support noted and welcomed
Copythorne Parish Council Infrastructure requirements cannot simply be justified by reference to the needs arising from proposed development. The location, scale, design and environmental consequences of the infrastructure itself also need to be considered. The Authority considers the policy is appropriately expressed to ensure new development is supported by improvements to infrastructure – in all cases the Local Plan needs to be read a whole and other policies may be implemented in terms of the scale and location of any proposed new infrastructure.
New Forest Association Disagree that mitigation for recreational impact contributions are subject to economic viability considerations Noted. Compliance with the legal requirements of the Habitats Regulations is mandatory and therefore mitigating HRA-related impacts is non-negotiable.
Boyer Planning obo Taylor Wimpey UK Ltd Support Support noted and welcomed

Local Plan Policy: Chapter 5 Climate Change (General)

Total Number of representations received: 2

No of respondents who confirmed the policy is:

  • Legally compliant: Yes 2
  • Sound: Yes 2
Respondent Main Issues Raised How the representations have been taken into account
Individual Consider increased risk of fire and transport impact as a result of climate change. The recent fire on the A31 had a huge impact on the tinder dry landscape which increased fire risk via traffic diversion which filtered into villages.

Agreed, it is recognised that an increased risk of wildfires is associated with drier summers, as a result of climate change.

Proposed modification PSM10

Add additional sentence to reference increased risk of wildfires in the National Park to paragraph 5.2 as follows:

Currently climate change is associated with warmer and wetter winter seasons, drier and hotter summers, rising sea levels and an increased frequency of extreme weather events. The New Forest National Park is likely to experience increased summer temperatures of around 5°C by the end of this century. Summer rainfall is expected to decrease by around 40% with winter rainfall up by around 20%. Sea level rise may be up by around 50cm, but possibly 75cm in worst-case scenarios. Development will need to mitigate and adapt to these changes, among other impacts, to ensure climate change does not have a detrimental impact on protected sites or the special qualities of the National Park. Building now means building for this future reality. Wildfires pose a significant risk to the National Park due to its areas of habitats like heathland, peatland and grassland which are especially vulnerable during drier conditions.

Local Plan Policy: SP7: Safeguarding and improving water resources

Total Number of representations received: 11

No of respondents who confirmed the policy is:

  • Legally compliant: Yes 4; No 1
  • Sound: No 5
Respondent Main Issues Raised How the representations have been taken into account
Southern Water No comments to make in respect of the plan. Recommendations from previous consultation have been included within the plan. National Park Authority has maintained high level of engagement. Comments and support are noted.
Copythorne Parish Council Overarching support for policy, however questions how water usage restrictions would be enforced. The updated water efficiency requirements are a standard informed by consultation with Southern Water who recommend a minimum lower than Building Regulation of 100 litres per person per day. As a policy requirement it is a consideration for the decision maker when a proposal for development comes forward. Water efficiency can be achieved through upgrading fittings, installing newer appliances, and ensuring tap functions do not permit excess water after use. Usage is conditioned at the planning application stage.
Individual Notes sewage issues at Lyndhurst Road, where proposed development is, especially during high rainfall. Comments are noted. Southern Water have been engaged on the draft Local Plan and have raised no objections to the proposed allocation.
Individual Notes surface water from site on Lyndhurst Road is discharged into a local watercourse, namely the River Blackwater which is very sensitive. Comments noted. The Environment Agency has been consulted on the draft Local Pan and have raised no objections to the proposed allocation.
Individual New developments should have effective waste disposal. Policies for maintenance and monitoring by Authority and Partners should be required. Water pollution incidents have increased, these should be pursued and enforced. River flows should be limited to maximum flows by introducing measures to slow the flow in upstream areas of catchment. Improving water retention in mires can mitigate effect of drought and wildfires. Monitoring water pollution is a task undertaken by bodies such as the Environment Agency and Natural England. The planning system can set out remediation measures as part of the development that comes forward. Applications for new dwellings and overnight accommodation within the National Park are subject to the requirement for nutrient neutrality.
Lucid Planning Ltd on behalf of Pennyfarthing Homes. The policy is not considered justified. Notes there can be instances where an existing drainage feature needs to be crossed by an access. Similarly there may be sites where it is better to reroute or amend/improve drainage features or improve flow rather than preserving them. Point b) and c) should be more flexible as aspirations are not always achievable. In reference to point d), the policy is open ended - how can it be monitored and measured. Policy should allow for site specific concerns to be addressed in consultation with relevant consultees on a site by site basis. Point e) goes beyond Building Regulations and policy should refer to this (110 litres). The draft policy wording has been prepared with input from consultees. The 100 litre water usage figure is supported by Southern Water and planning authorities can go beyond Building Regulations where justified. The planning system has a degree of flexibility built in through Section 38(6) of the Planning & Compulsory Act 2004. Criterion (d) and (e) of the policy has been prepared with input from Southern Water and reflect the fact that the New Forest is ‘water stressed’.
Blackwater Conservation Group Believes this policy will place the River Blackwater at risk from surface run-off associated with the proposed development at Lyndhurst Road, Landford (SP40). Under SP7 any surface water will feed into the Blackwater as it is the only watercourse in the area. Pollution is a huge risk in addition to overloaded sewers along Lyndhurst Road. Purpose of SP7 is to protect designated sites and ensure development is able to address surface water run-off and prevent pollutants entering watercourses. The Environment Agency has been consulted on the draft Local Pan and have raised no objections to the proposed allocation.
Brockenhurst Parish Council There is no control in Brockenhurst so run-off causes flooding in village. There is a need to clean up pollution from sewage systems, however there is no mention of pollutants going straight into rivers and streams. Purpose of SP7 is to protect designated sites and ensure development is able to address surface water run-off and prevent pollutants entering watercourses, as outlined within the policy.
Environment Agency Supportive of policy. Support is welcomed.
Test Valley Borough Council Supportive of policy. Support is welcomed.

Local Plan Policy: SP8: Flood risk

Total Number of representations received: 9

No of respondents who confirmed the policy is:

  • Legally compliant: Yes 4; No 0
  • Sound: Yes 0; No 4
Respondent Main Issues Raised How the representations have been taken into account
Individual Policy SP40 is in conflict with this policy as the site suffers from flooding issues which disrupts local residents. Wiltshire Council is the Lead Local Flood Authority for this area of the National Park. They have been consulted throughout the Local Plan Review process, in addition to Southern Water, and have raised no objection to the proposed site allocation.
Copythorne Parish Council Notes criteria within NPPF 2024 and that flooding should influence where development goes, as flood risk is a spatial planning consideration, not simply a technical issue to be resolved through conditions or site design. Wording within NPPF 2026 should also be noted. All sources of flooding should be considered, and not rely purely on flood zone designation. Bartely should also be recognised as a known area at risk of flooding.

Agreed, Bartley is considered to be impacted by the risk of surface water flooding alongside Cadnam.

Proposed modification PSM9
Paragraph 5.27 to also reference Bartley (in addition to Cadnam) as an area at risk to surface water flooding.

Lucid Planning Ltd on behalf of Pennyfarthing Homes. Comments made on behalf of Pennyfarthing homes. Approach to policy is not justified. Point b) is contradictory as development will not be permitted if it does not comply with sequential test and if development is in flood zone 2. The need for point d) in regard to a catchment approach is not needed as catchment relates to PfSH SFRA work and covers a wider area e.g., to manage flood risk within a river basin catchment across their boundaries. Comments are noted. This policy is an evolution of the existing planning policy approach in the National Park which has been in place since 2019.
Individual Notes surface water issues at Redlynch site, stating that water runs off to properties in Quavey Road and Kiln Alley. The Lead Local Flood Authority (Wiltshire Council) has been consulted on the proposed site allocation and the policy criteria wording reflects their feedback.
Individual Comments in relate to SP40 site allocation and note flooding and sewage system issues. This will have an effect on the River Blackwater which supports species such as grayling and migratory sea trout. The effects of flooding due to climate change will worsen impact on/around site. Developing the site will result in a loss of back-up grazing/agricultural land which are important to the future. Car use will increase around site as Landford isn't served well by other transport. Has the LPA considered the brownfield sites at Whiteparish instead to bring forward development. Whiteparish is located outside the New Forest National Park and within Wiltshire Council’s planning jurisdiction. The Environment Agency have been engaged during the preparation of the New Forest National Park Local Plan and have raised no objection to the proposed site allocation in policy SP40. The site has not been used for grazing and the Strategic Land Availability Assessment (SLAA) sets out more details of the site selection process.
Brockenhurst Parish Council Notes that while the NPA is not the Lead Flood Authority, it does have influence through planning matters and in decision making with other organisations. No active intervention is proposed to mitigate the flooding which can be caused by heavy rainfall within the National Park. The effects have worsened as climate change has evolved. Surprised interventions haven't been proposed for flood risk areas of Brockenhurst and Cadnam. The New Forest National Park Local Plan focuses on addressing the impacts of planned new development within the National Park. Hampshire County Council (as the Lead Local Flood Authority), the Environment Agency and landowners continue to have the primary responsibilities for managing flood risk.
Environment Agency Policy wording is satisfactory. Support is welcomed.
Environment Agency PfSH Level 1 Strategic Flood Risk Assessment, included in the evidence base, will require an update in the next few years to accord with latest data. NPPF and PPG says that in plan-making, local authorities should apply the sequential/exception test when allocating sites. There doesn't seem to be record of the results of the Sequential Test within the evidence base. Only 1 allocated site (SP40) has areas of Flood Zone 1, 2, 3. The policy does require built development to be focused within Flood Zone 1. Therefore, it shouldn't be onerous to include the results of a Sequential Test within the evidence base to accord with national policy. Comments are noted. The NPA has collated the information considered on flood risk in a Sequential Test Report which forms part of the evidence base for the Local Plan. This confirms that no built development is proposed outside Flood Zone 1 for fluvial flooding on all the proposed site allocations; with all sites having less than 20% affected by surface water run off. Where appropriate the respective site allocation policies include criteria relating to managing flood risk.

Chapter 11 Monitoring and implementation and Annexes

4.6 Alongside the main chapters of the Regulation 19 Submission draft Local Plan, representations could also be submitted on Chapter 11 (Monitoring and Implementation) and the Annexes to the draft Plan. Set out below is a summary of the representations received on Chapter 11 and the Local Plan Annexes.

Respondent Main Issues Raised How the representations have been taken into account
Test Valley Borough Council Welcome the inclusion of a section on Test Valley within Annex 4 on the rural affordable housing parish cascade. This section seeks to align with our own approach to allocations and cascading. However, we suggest some small changes to ensure there is a clear aligned approach set out in the Plan PSM33 and PSM34 Amend paragraphs 5 and 6 of Annex 4 in line with TVBC’s suggested minor modifications to refer to the Borough Council’s ‘Scheme of Allocations’ (and any other such document or policy that may replace it).

Evidence and supporting documents

4.7 Alongside the Regulation 19 Submission draft Local Plan, the National Park Authority also published the main evidence base studies and supporting information to the Plan as part of the 6 week consultation in August and September 2026. A limited number of representations were received on these during the consultation and the main points raised are set out below.

Respondent Main Issues Raised How the representations have been taken into account
Individuals Housing Needs Assessment - objection to the allocation of Landford – Nomansland as a Defined Village This is not a representation on the Housing Needs Assessment per se. See separate responses to Chapter 4 Spatial Strategy
Individuals Gypsy & Traveller Accommodation Assessment - object to allocation under Policy SP50 This is not a representation on the GTAA per se, but to do with the Authority’s to meeting the identified need. See response to SP50 under Chapter 8
Individuals Strategic Flood Risk Assessment - objection to the allocation of Landford – Nomansland as a Defined Village The Environment Agency and Wiltshire Council have raised no objection to this element of the Plan. See responses to Chapter 4 Spatial Strategy
NHS Property Services

Economic Viability Assessment - the assessment of plan-wide viability demonstrates that policy requirements in relation to healthcare infrastructure contributions are deliverable. Concerned that without explicit mention healthcare will compete with other obligations. Recommend the viability assessment includes a separate cost input for typologies where a healthcare contribution is expected

Infrastructure Delivery Plan

The Economic Viability Assessment (Three Dragons, 2026) tested the main development typologies likely to come forward within the National Park area over the plan period. The assessment identified a degree of viability ‘headroom’ and so healthcare contributions could still be sought where required. The NHS and healthcare representative bodies have also been consulted on the preparation of the Infrastructure Delivery Plan.
Individual

SP41 There is no acknowledgement of the need for cross boundary service funding

Habitats Regulations Assessment

There are critical omissions regarding statutory nature recovery frameworks, and the cumulative effect of environmental degradation is underestimated – delete site allocated under SP41

Strategic Land Availability Assessment

The NPA and Wiltshire Council have a signed Statement of Common Ground and contributions would be secured at the planning application stage.

The HRA assess impacts on internationally designated sites in and around the New Forest and no impacts have been identified in relation to draft policy SP41.

Luken Beck (on behalf of Seaward Properties); Boyer Planning obo Taylor Wimpey UK Ltd Promote sites for residential use. Representations on the outputs of sites assessed, particularly when sites are recorded as available and achievable but not suitable – with particular reference to landscape, relationship with settlements and facilities. The Housing Land Availability Assessment sets out the Authority’s consideration of the sites submitted. The allocation of sites within a nationally protected landscape must be informed by consideration of the statutory framework for National Parks.
Vail Williams LLP (on behalf of Trant Estates Limited) Site promoted for renewable energy and the opportunity should be taken to enhance support for renewable energy development including the allocation of suitable sites. The point raised in tis representations has been considered in the review and preparation of the local planning policy on renewable energy in the Climate Change chapter.
Individual Lack of consultation with Bath and North East Somerset, Swindon and Wiltshire Integrated Care Board in relation to proposed development within the Wiltshire area of the National Park The Authority has engaged with the Bath & North East Somerset, Swindon and Wiltshire ICB in the preparation of the Infrastructure Delivery Plan. The ICB were contacted in September 2026 and invited to submit representations on the Submission draft Local Plan within a 6 week period.

Appendices

Appendix A – Specific and General Consultees notified of the Regulation 19 consultation

  • Mining Remediation Authority
  • Historic England
  • Natural England
  • Environment Agency
  • Marine Management Organisation
  • National Highways
  • National Grid
  • Bournemouth Water
  • Wessex Water
  • Southern Water
  • Hampshire & Isle of Wight Integrated Care Board
  • Bath and North East Somerset, Swindon and Wiltshire Integrated Care Board
  • Dorset Council planning
  • Southampton City Council
  • Bournemouth, Christchurch & Poole Council
  • Wiltshire Council
  • Hampshire County Council
  • New Forest District Council
  • Test Valley Borough Council
  • Sir Desmond Swayne
  • Sir Julian Lewis
  • Christopher Chope
  • Caroline Nokes
  • John Glen
  • Ashurst & Colbury Parish Council
  • Beaulieu Parish Council
  • Boldre Parish Council
  • Braemore Parish Council
  • Bramshaw Parish Council
  • Bransgore Parish Council
  • Brockenhurst Parish Council
  • Burley Parish Council
  • Copythorne Parish Council
  • Denny Lodge Parish Council
  • East Boldre Parish Council
  • Ellingham, Harbridge & Ibsley Parish Council
  • Exbury & Lepe Parish Council
  • Fawley Parish Council
  • Fordingbridge Parish Council
  • Godshill Parish Council
  • Hale Parish Council
  • Hordle Parish Council
  • Hyde Parish Council
  • Hythe & Dibden Parish Council
  • Landford Parish Council
  • Lymington & Pennington Town Council
  • Lyndhurst Parish Council
  • Marchwood Parish Council
  • Melchet Park & Plaitford Parish Council
  • Milford on Sea Parish Council
  • Minstead Parish Council
  • Netley Marsh Parish Council
  • New Milton Town Council
  • Redlynch Parish Council
  • Ringwood Town Council
  • Sopley Parish Council
  • Sway Parish Council
  • Totton & Eling Parish Council
  • Wellow Parish Council
  • Whiteparish Parish Council
  • Woodgreen Parish Council
  • Action Hampshire
  • Age Concern Hampshire
  • Associated British Ports
  • Bournemouth International Airport Ltd
  • Calshot Activities Centre
  • Campaign for National Parks
  • CPRE Hampshire
  • Christchurch Bicycle Club
  • Community First New Forest
  • Country Land and Business Association SE
  • Country Land and Business Association SW
  • Cranborne Chase & West Wilts Downs National Landscape
  • ExxonMobil Chemical Ltd
  • Federation of Small Businesses
  • Friends, Families and Travellers
  • Fordingbridge Society
  • Forestry England
  • Friends of Brockenhurst
  • Friends of the New Forest
  • Hampshire Chamber of Commerce
  • Hampshire and Isle of Wight Wildlife Trust
  • Hampshire Association of Local Councils
  • Hampshire Field Club & Archaeological Society
  • Hampshire Constabulary - Designing Out Crime officer
  • Hampshire Fire & Rescue Service (New Forest Group)
  • Hampshire Gardens Trust
  • Hampshire Outdoor Centres
  • Hampshire Scouts
  • Homes England
  • Lepe Country Park
  • Lymington & District Chamber of Commerce & Industry Limited
  • Lymington Harbour Commissioners
  • Lymington Society
  • Jackson Planning
  • National Farmers' Union
  • National Grid
  • National Trust
  • National Trust Hants & IoW
  • Network Rail
  • New Forest Access Forum
  • New Forest Business Partnership
  • New Forest Centre
  • New Forest Commoners' Defence Association
  • New Forest Equestrian Association
  • New Forest Friends of the Earth
  • New Forest Hounds
  • New Forest Runners Club
  • Meyrick Estate
  • New Forest Sports Council
  • Go New Forest
  • New Forest Trust
  • Ramblers Association (New Forest Branch)
  • Ringwood Society
  • Royal Society for the Protection of Birds (RSPB)
  • Sandy Balls Estate
  • Sandy Balls Holiday Village
  • The Showmen's Guild of Great Britain Central Office
  • The Showmen's Guild of Great Britain Western Office
  • Solent LEP
  • Solent Forum
  • Solent Protection Society
  • Southampton Airport
  • Sport England
  • SSE
  • Swindon & Wiltshire LEP
  • The Caravan Club Ltd
  • Tourism South East
  • Verderers of the New Forest
  • Wild New Forest
  • Wilts & Dorset Bus Co Ltd
  • Wiltshire Association of Local Councils
  • Dorset & Wiltshire Fire & Rescue
  • Wiltshire Wildlife Trust
  • UK Youth
  • New Forest Transition CIC
  • Ringwood Actions for Climate Emergency (RACE)
  • Minstead Green Group
  • Greener Brockenhurst
  • ECO Sway
  • Conservation Connection New Forest South
  • Cadland Estate
  • Bisterne, Pylewell & Sowley Estates
  • Exbury Estate
  • Somerley Estate
  • Hamptworth Estate
  • Beaulieu Estate
  • Hinton Admiral Estate
  • Pylewell Estate

Appendix B - Promotion of Regulation 19 consultation

Press releases:

Issued 10 July 2026 to 171 news outlets and community magazines, and was available to view on the Authority’s website, it received nearly 300 views: Local Plan Review for New Forest National Park - New Forest National Park

Launch of consultation: Have your say on the draft New Forest National Park Local Plan - New Forest National Park

Media coverage:

  • Local Plan Review for New Forest National Park - New Forest National Park
  • Next steps taken for New Forest National Park Local Plan | Daily Echo
  • The draft NPA Local Plan will be considered by authority members next week
  • New Forest National Park Local Plan six-week consultation | Bournemouth Echo
  • New Forest National Park Local Plan six-week consultation | Salisbury Journal
  • Residents invited to have their say on draft New Forest National Park Local Plan - Yahoo News UK
  • Have your say on the draft New Forest National Park Local Plan - Netley Marsh
  • New Forest National Park Draft Local Plan | Landford Parish Council

Park Life newspaper:

Park Life is produced twice a year, in conjunction with the Lymington Times. Copies were distributed together with the Lymington Times, to visitor attractions.

A digital version was also made available on the National Park website.

Readership for Spring/Summer 2026 edition 56,250

Newsletters:

Enews (27,000 subscribers)

Sent 11 August:

Sent 27 August:

Sent 11 September:

Facebook banner displayed during the consultation:

Poster:

Sent to all local towns and parishes and displayed in notice boards around the New Forest

On-line session and Drop in Events:

An online presentation and consultation event was held via Microsoft Teams on Thursday 10 September 2026, between 4pm – 5.30pm.

Drop-in Events:
Location Date
Landford Village HallWednesday 2 September 2026
Bartley Village HallFriday 4 September 2026
The Copythorne & District Royal British Regional HallMonday 7 September 2026
Jubilee Field, SwayTuesday 8 September 2026
Lyndhurst Community CentreFriday 11 September 2026
Redlynch Village HallWednesday 16 September 2026

All drop-in sessions were structured as follows:

  • 2pm-5pm - view the display boards and chat informally with National Park Authority officers about the revised draft Local Plan.
  • 5.30pm Presentation explaining the key changes since the 2025 consultation and the next steps for the Local Plan, followed by a managed Q&A session.

Drop-in session Q&A at Lyndhurst:

Social media:

31 published posts across NPA Facebook channels, including Facebook, X, LinkedIn and Instagram.

An average engagement rate of 3.9% was achieved, which is well above the local government average of 1.1%

Total

Appendix C - Public notice

Appeared in the Lymington Times and New Milton Advertiser on Friday 14 August.